Case Study
BMJV, M62 J10-12 widening scheme
LOCATION: M62 J10-12, M6 – M60 Link CLIENT: Highways England MAIN CONTRACTOR: BMJV ECOCRIB SYSTEM: Mass Gravity MAX. RETAINED HEIGHT: 1.8m FACE AREA: 2984 m2 PLASTIC WASTE DIVERTED FROM LANDFILL: 222 tonnes ECOCRIB CASE STUDY BMJV, M62 J10-12 widening scheme The Challenge In 2018 a joint venture of Bam Nuttall and Morgan Sindall were awarded the £200 million smart motorway scheme by Highways England. These works were to improve the flow of traffic between the M6 and the M60. This involved improving the link road between these two busy Highways which is the M62 J10-12. Many Embankments needed to be retained to fit the new ERAs and to allow room for many of the gantries that are needed on a smart motorway scheme. One of the main challe