Case Study

Case Study: Datum

Case Study: Datum

Case Study: Datum

Pages 2 Pages

Datum, a leading colocation services provider with state-of-the-art facilities in Manchester and Farnborough, delivers robust IT infrastructure hosting focused on uptime, security, and efficiency. At their Manchester site, Datum required a planned lifecycle replacement of an existing condenser system for the critical data centre space, seizing the opportunity to enhance performance amid rising UK climate temperatures through optimized design and selection. Sudlows' advanced software optimized the upgraded condenser system, delivering superior cooling efficiency, real-time energy monitoring, predictive maintenance analytics, and seamless climate adaptation that ensured uninterrupted operations, reduced energy costs, and elevated reliability for Datum's mission-critical hosting environment.

Join for free to read