Case Study
European Engineering Company Saves $400,000 USD on CAPEX Using Performance Engineering
Case Study European Engineering Company Saves $400,000 USD on CAPEX Using Performance Engineering$ 400K USD CAPEX savings CHALLENGE Revamp the gas treatment technology at Hungary’s largest underground gas storage facility to meet new European (EN) standards. SOLUTION Using Aspen HYSYS ® and Aspen Exchanger Design & RatingTM (EDR), PETROLTERV rigorously simulated and designed improvements to their gas treatment process that met new EN standards. BENEFITS • Saved up to $400,000 USD on CAPEX via greater design accuracy • Reduced costs by enabling PETROLTERV to perform design projects that were previously outsourced • Completed projects on time and on budget “With the flexibility of Aspen HYSYS and the full Performance Engineering suite, our organization has been able to expand its
