Case Study

JBT AeroTech

JBT AeroTech

Pages 8 Pages

During the pandemic, JBT AeroTech achieved measurable improvements in supply chain performance by improving supplier communication and visibility. Previously, missing parts delayed production starts 31% of the time, and suppliers delivered on time only 68% of the time. By addressing both internal and external challenges, JBT AeroTech significantly improved supplier on-time delivery by 31%, reduced missing parts by 76%, and increased customer on-time delivery to 89%. These gains also strengthened cash flow, demonstrating that even under global disruption, better collaboration and process control can drive strong operational results.

Join for free to read