Bentley helped Keystone Engineering cut installation costs by 20% on the first U.S. offshore wind farm by using its SACS Wind Turbine software. SACS optimized the steel jacket foundation design, shortening design time and enabling safe, efficient substructure development for the Block Island Wind Farm. This approach ensured structures could endure severe weather conditions like 100-year storms while reducing material use and costs. Bentley’s advanced modeling accelerated collaboration, improved design accuracy, and contributed to the project's overall success.