Nansha Phoenix I Bridge Connecting the Jiaomen waterway
Project Page: Nansha Phoenix I Bridge Nansha Phoenix I Bridge 1. Build across the Jiao men waterway :Connecting the Jiaomen waterway, Mountain Peninsula, The upper Hengli waterway, Hengli Peninsula and Under Hengli waterways, At the end of the Pearl River Management district.at Nansha Guangzhou, Guangdong, China 2. Location Used: Cap (footing) and Pier (column) 3. Features Provides corrosion-proof to cap (footing) and pier (column) concrete, simple and fast construction, low maintenance and construction cost, enhance durability of the bridge concrete structure. Completion Date: Dec 30, 2011 Architect: Not know Contractor: CCCC Second Harbor Consultants Co.,Ltd Structural engineer: Nil Products Used: Everdure Caltite Address: NanSha Guangzhou, Guangzhou, , China Type: Bridges Powered by T