PLAYING OUR PART IN DELIVERING A MORE CONNECTED SOUTH PACIFIC
DXN LIMITED | Case Study PLAYING OUR PART IN DELIVERING A MORE CONNECTED SOUTH PACIFIC MANUFACTURED TRANSPORTED AND INSTALLED IN 6 MONTHS Industry: Communications Solutions Specifications: • Build to withstand seismic zone 4 and Category 5 cyclones • 4 Racks total 8kW IT load • 2N fully redundant DC power system with 4hrs battery backup • N+1 cooling redundancy • VESDA and Argon gas fire suppression • Full access control & CCTV security Overview DXN was contracted by the Government of Niue to design, engineer, build and deliver a prefabricated cable landing station which will be the point of termination for the first submarine cable that will be landing in the pacific island of Niue.