SURF INSTALLATION PROJECT COMPLETED AHEAD OF SCHEDULE DURING MONSOON SEASON

SURF INSTALLATION PROJECT COMPLETED AHEAD OF SCHEDULE DURING MONSOON SEASON

SURF INSTALLATION PROJECT COMPLETED AHEAD OF SCHEDULE DURING MONSOON SEASON

Pages 1 Pages

Project name: Mampu-1 FPSO ESP Installation Location: AJK Field (168km North-West offshore Bintulu and 30km South-East of Kumang Gas Field) Region: Sarawak, offshore Malaysia Client: MISC Offshore Floating Terminals Dua Ltd (MOFT2), a subsidiary of MISC Berhad Work scope: Project management, engineering and offshore operations for the installation of • one electric submersible pump (ESP) power generation module on FPSO MAMPU-1 • one chute support structure at the Tarpon platform • one shelter structure at the Tarpon platform • install/laying 1.26km of subsea power cable between FPSO MAMPU-1 and Tarpon platform. THE PROBLEM InterMoor was contracted by MOFT2 for the provision of upgrading MAMPU-1 and modification at Anjung Kecil (AJK) wellhead platform offshore installation. The