The Shanghai Laogang Project used digital innovation made possible by AVEVA

The Shanghai Laogang Project used digital innovation made possible by AVEVA

The Shanghai Laogang Project used digital innovation made possible by AVEVA

CUSTOMER CASE STUDY Shanghai Environmental Group Industry - Power Generation CUSTOMER CASE STUDY The Shanghai Laogang Project used digital innovation made possible by AVEVA to transform the design, construction and delivery of the world’s largest waste-to-energy plant Goals y Streamline the supply chain operations y Swifter, more effective collaboration between engineering and design teams y Gain regular data updates between EPC and the plant operator Challenges y Inaccurate data that couldn’t be shared easily or consistently between designers of different elements of the plant y Data interference and collision issues that resulted in delays and extra costs y No mechanism for transferring consistent, correct data between the EPC and the operator AVEVA Solution y 3D P