A tier-one industrial controls OEM faced chronic backlogs and on-time delivery failures for complex, build-to-order systems (lot sizes of one) requiring 10-day lead times. Challenges included 1,200+ components from 130 suppliers (34-week cumulative lead times), integration of electronics, hydraulics, motors, pumps, valves, 100+ cables per 1,000+ lb assembly, and three-phase testing up to 600V. Sanmina's advanced software revolutionized vertical integration and supply chain management—optimizing procurement, real-time visibility, manufacturing workflows, and automated testing to eliminate backlogs and consistently achieve 10-day deliveries.