Case Study

Dragados and London Underground Streamline Collaboration on Major Subterranean Station Upgrade

Dragados and London Underground Streamline Collaboration on Major Subterranean Station Upgrade

Dragados and London Underground Streamline Collaboration on Major Subterranean Station Upgrade

Pages 2 Pages

ProjectWise Facilitated Collaboration Among 400+ Users on Thousands of Designs Fast Facts • The Bank-Monument station is used by more than 52 million passengers each year, one of the most complex subterranean railway stations in the United Kingdom. • The Bank Station Capacity Upgrade will provide an additional 45 percent capacity during peak hours. • Bentley’s Connected Data Environment based on ProjectWise was accessed by 425 individual users, with 120 concurrent users during peak design time. ROI • ProjectWise housed approximately 1,800 3D models and almost 4,800 drawings. • The project team streamlined workflows and collaboration, increasing the overall project value by 40 percent.

Join for free to read